Background and pre-feasibility study reports

The MCWSG and its specialist consultants have completed a Pre-Feasibility Study. Feasibility study was completed in early 2015. Given the unexpectedly high costs for the project, during 2015 further work was undertaken to refine the costs and confirm the preferred options for the project. This was known as the validation and refinement project which was completed in early 2016.  This section includes:
  • A summary of all the reports written during the Pre-Feasibility Study;
  • The background reports (called stages 1, 2 and 3a) which led to the decision to carry out a Pre-Feasibility Study;
  • The various reports which make up the full Pre-Feasibility Study (called Milestones).

Top

This page is best viewed in an up-to-date web browser with stylesheets (CSS) enabled. While you will be able to view the content of this page in your current browser, you will not be able to get the full visual experience. Please consider upgrading your browser software or enabling style sheets (CSS) if you are able to do so. The latest version of Firefox, Safari, Google Chrome or Internet Explorer will work best if you're after a new browser.